Gentilly-2 Refurbishment Postponed – First Cycle End of Life
9th International Conference on CANDU® Maintenance - 2011 December 04-06


Presented at:
9th International Conference on CANDU® Maintenance
2011 December 04-06
Location:
Toronto, Canada
Session Title:
Industry Performance Special Session C1

Authors:
Daniel Godin (Hydro-Québec, Centrale Nucléaire Gentilly-2)
Denis Bérubé (Hydro-Québec, Centrale Nucléaire Gentilly 2)
Michel Cantin (Hydro-Québec, Centrale Nucléaire Gentilly 2)
  

Abstract

 

In August 2010 Hydro-Québec decided to postpone the start of refurbishment work of Gentilly 2 reactor. This decision was made in the context of problems met at the refurbishment projects of Point Lepreau and Wolsung.

Following this decision, the Gentilly 2 Life Cycle Management Plans of the major components had to be revised. In less than six months, assessments have been reviewed and allowed the updating of LCMPs. Following these updates, work has been planned for the 2011 shutdown for allowing operation beyond 196 000 EFPH.

Finally, work has been performed as prescribed in LCMPs. The preliminary results are within the assessments limits. The safe operation of Gentilly 2 can be performed until the new date of refurbishment.

Individual Conference-Paper Copies (Electronic Where Available):

  • For CNS members, the first 5 copies per calendar year are free, and additional copies are $10 each.
  • For non-members, the price is $25 for the first Conference-paper copy in a request, and $10 each for additional copies of papers in the same conference and in the same request.
  • Contact the CNS office to order reprints.