Isotope Production Technologies from a Regulatory Perspective
33rd Annual CNS Conference - 2012 June 10-13


Presented at:
33rd Annual CNS Conference
2012 June 10-13
Location:
Saskatoon, Canada
Session Title:
Plenary IV: Building on our past...building for the future

Authors:
Kavita Murthy (CNSC)
  

Abstract

The AP1000 is currently under construction in both China and the US with the first one scheduled to come on line in late 2013. 

Nuclear power is a proven, safe, plentiful and clean source of power generation, and Westinghouse Electric Company, the pioneer and global leader in nuclear plant design and construction, is ready with the AP1000™ pressurized water reactor (PWR). The AP1000, based on the proven performance of Westinghouse-designed PWRs, is an advanced 1154 MWe nuclear power plant that uses the forces of nature and simplicity of design to enhance plant safety and operations and reduce construction costs. 

Individual Conference-Paper Copies (Electronic Where Available):

  • For CNS members, the first 5 copies per calendar year are free, and additional copies are $10 each.
  • For non-members, the price is $25 for the first Conference-paper copy in a request, and $10 each for additional copies of papers in the same conference and in the same request.
  • Contact the CNS office to order reprints.