Improvements Made to the Bruce A Upgraders and Heavy Water Cleanup System as Part of the Bruce A Units 1 and 2 Restart Project and Commissioning Results
34th Annual CNS Conference - 2013 June 09-12


Presented at:
34th Annual CNS Conference
2013 June 09-12
Location:
Toronto, Canada
Session Title:
Plant Life Extension, Refurbishment & Aging

Authors:
Ram Davloor (Bruce Power)
Gretel Steinberg (SNC-Lavalin Nuclear, Inc.)
Charles Boddy (SNC-Lavalin Nuclear, Inc.)
Daniel Rocci (Aecon Nuclear)
  

Abstract

As part of the Bruce A Units 1 and 2 Restart Project, major modifications and maintenance were completed on the heat transport and moderator upgraders and the heavy water cleanup system. This represents the first time that major rehabilitation has been done to such systems in a CANDU nuclear station for the purpose of life extension. Prior to shutdown in 1997, the upgraders and cleanup system significantly underperformed against the stated design. The rehabilitation, which included major design changes and implementation of new systems, resulted in the upgraders exceeding design throughput and making product with quality much better than specified. This paper describes the work done, results from inspections and follow-up, and performance data from commissioning.

Individual Conference-Paper Copies (Electronic Where Available):

  • For CNS members, the first 5 copies per calendar year are free, and additional copies are $10 each.
  • For non-members, the price is $25 for the first Conference-paper copy in a request, and $10 each for additional copies of papers in the same conference and in the same request.
  • Contact the CNS office to order reprints.