The Stability Analysis of LAPUR6 for Chinshan BWR Nuclear Power Plant
NURETH-14 - 2011 September 25-30


Presented at:
NURETH-14
2011 September 25-30
Location:
Toronto, Canada
Session Title:
E3-1 Instabilities and Nonlinear Dynamics

Authors:
Jong-Rong Wang (Institute of Nuclear Energy Research Atomic Energy Council, R.O.C.)
Hao-Tzu Lin (Institute of Nuclear Energy Research Atomic Energy Council, R.O.C.)
Chunkuan Shih (National Tsing Hua University)
  

Abstract

Chinshan Nuclear Power Plant (NPP) is the first NPP in Taiwan which is a BWR/4 plant. The original rated power for each unit was 1775 MWt. After the project of measurement uncertainty recovery (MUR) for Chinshan NPP, the operating power is 1805 MWt now. The Chinshan NPP Unit 2 cycle 23 stability analyses were performed by the LAPUR6 stability analysis methodology. Comparing the LAPUR6 stability analysis results and vendor’s results, they are similar.

Individual Conference-Paper Copies (Electronic Where Available):

  • For CNS members, the first 5 copies per calendar year are free, and additional copies are $10 each.
  • For non-members, the price is $25 for the first Conference-paper copy in a request, and $10 each for additional copies of papers in the same conference and in the same request.
  • Contact the CNS office to order reprints.